Entertainment
Warner Bros network infrastructure: resilient links across three London buildings
ACCL connected three Warner Bros London buildings using a 1 Gigabit CableFree laser link, microwave voice link and point-to-point Wi-Fi backup after permanent ISP circuits were delayed.
The Winter Club, Canary Wharf: network, Wi-Fi and CCTV infrastructure
Permanent-grade technology infrastructure for a fast-track seasonal hospitality and entertainment venue.
Wise Music Group, London: comms room relocation
A staged five-floor comms room relocation, completed during normal working hours with zero network downtime.
