Having found premises for its new London office, the Canadian based mining company RM Gold decided on a full refurbishment, to create a high-quality, high-tech environment commensurate with the head office of a leading natural resources business. Communications cabling was outside the remit of the main contractor engaged for the refit, so the company had to select an installer itself…..and who better for the Job than ACCL.
The company spokesperson who led the project, explains: “We drew up a structured cabling statement of requirements and invited quotes from three companies. An associate had recommended ACCL, and I was immediately impressed with its competitive pricing and comprehensive understanding of our requirements.”
The structured cabling solution that ACCL installed was a Nexans Category 6 cabling system serving seventy-nine RJ45 outlets, housed in either floor boxes or floor grid outlet positions, fed from a single Comms room via a raised floor void.
ACCL completed the project on time, to plan and within budget and our friendly Company spokesperson was ready to speak up again… “I found ACCL very responsive and easy to work with. Nothing was too much trouble. So when I discovered that it carried out electrical installation too I had no hesitation in extending the contract to include our power and lighting work.”
ACCL were more than happy to help and installed a Powerplan Electrak underfloor system to supply all power requirements including air conditioning, kitchen area appliances, and AV systems. It also supplied the lighting cabling, installing a managed Prolojik PIR movement-switching environment for the main office areas, and individual single switching for newly constructed offices.
ACCL added considerable value by proposing changes to the lighting specification to create visual impact. An example is the LED lighting systems in the reception area and along the adjacent feature wall leading to the boardroom, separately controlled from switches at the main entrance. To complete the project ACCL also supplied AV cabling, AV hardware, a Sky TV feed, and ten 50-inch plasma flat screen TVs in the boardroom, the break out area, and along the feature wall.
RM Gold and ACCL worked together as a Team to ensure that the project was a success.
ACCL designs, implements and supports the data and communications networks which provide connectivity and drive business performance. Privately owned, and with more than 25 years of experience in London and the South East, customers are at the heart of everything we do. Our specialist cabling services are designed with your current and future needs in mind, bringing high quality solutions that are excellent value.
CONTACT US NOW OR CALL 0333 900 0101 FOR OUR NETWORK DESIGN SERVICESACCL upgrades network at Southampton Football club
ACCL delivers a TAS solution to Grand Wigan Arcade to imrpove their communications system
ACCL install TAS solution for Princesshay Shopping Centre, creating a reliable and responsive communications system to increase the security and efficiency of the shopping centre.
ACCL installs new 10 gigabit network with new fibre optic backbone to link twenty network cabinets at Tui’s Luton Head office
ACCL upgrades Voice and Data Communication network at Luton Hoo Hotel.
ACCL install state-of-the-art cabling infrastructure at RAF Museum in Hendon
As the client I can only say thanks and its an amazing piece of work by all involved. Believe me that the work to coordinate this work around other issues was challenging but Wayne and ACCL were great.
I have had the pleasure of asking Wayne and team for advice and guidance over a number of years, and have always felt assured that all advice I have received was totally unbiased and 100% accurate.
The Engineers were helpful and patient. They did anything and everything that was asked of them. Thanks for a very good first job.
The Engineers were punctual and courteous whilst on site. They worked professionally, always being aware of the needs of the other tradesman who were also working on this project. They were sympathetic to the needs of the school and we are very satisfied with the overall installation.
Another professional installation by ACCL, on time and in budget!
All the people involved were extremely helpful at all times. All performed equally well in a fast-track project and responded quickly to any changes in requirements.