Frequently Asked Questions
Can installation occur without closing terminals?
Yes. Night‑shift scheduling during curfew, coordinated with operations control, ensures no passenger disruption. Temporary bypass links maintain FIDS, check‑in and security.
Do works require full airside passes?
Our engineers hold airside passes and ADR training. Escort procedures can be arranged where short‑term visitor passes are preferred.
Is shielded cable necessary in all zones?
We recommend shielded Cat 6A near high‑EMI zones (baggage drives, jet‑bridge motors). Administrative offices may utilise F/UTP to balance budgets.
How soon can ESN or private 5G be integrated?
Designs include spare fibre and PoE capacity; when spectrum allocations and small‑cell plans finalise, cabling is ready.
Are warranties transferrable if terminal concessions change?
Yes. The 25‑year system warranty stays with the installation, reassuring concessionaires and PPP operators.