Edible Oils, Erith: structured cabling and high-bay Wi-Fi for four new production lines
ACCL upgraded the network infrastructure at the Edible Oils Erith site to support four new production lines, installing Cat6a cabling, diversely routed OM4 fibre and 32 Aruba Wi-Fi access points around live production.
Mulalley: rapid 5G connectivity for 36 temporary construction sites
A single repeatable 5G build kept 36 of Mulalley’s temporary London construction sites online from day one, with no dependence on fixed-line broadband.
City of London Workplace: 539 Warranted Cat 6A Links and Two-Stage Wi-Fi Validation
ACCL delivered 539 warranted Cat 6A links, wireless and CCTV cabling and a rationalised communications room for a City of London workplace, phased around a live fit-out.
Southampton FC: HP to Cisco Meraki Wi-Fi infrastructure upgrade
ACCL supported Southampton FC’s move from approximately 70 HP access points to around 130 Cisco Meraki APs across St Mary’s Stadium and Staplewood, delivered within an approximately six-week close-season programme.
Queen Mary’s Hospital, Roehampton: from early cost planning to 2,500-outlet Cat6 delivery
ACCL worked with Bovis Lend Lease from early cost planning and design development through to an 18-month Cat6 structured cabling installation at the new Queen Mary’s Hospital, Roehampton.
Foresight Group, The Shard: integrated office technology infrastructure
ACCL delivered the integrated cabling, Wi-Fi, AV, audio and security infrastructure behind Foresight Group’s 17,710 sq ft Level 23 office at The Shard.
Grant Thornton, 30 Finsbury Square: structured cabling across a decade of workplace transformation
ACCL supported Grant Thornton through three phases of workplace transformation at 30 Finsbury Square over almost a decade: relocation, refurbishment and headquarters consolidation.
Verizon Business, London Hub: 358 Cat6A Outlets and Rooftop Private 5G
ACCL designed, installed and certified the structured cabling, fibre backbone and rooftop Private 5G infrastructure behind Verizon Business’s enterprise innovation centre at MidCity Place, Holborn, delivering 358 Cat6A outlets in a fixed eight-week programme.
UNIQLO Oxford Street: 1,500 Cat6 outlets and resilient fibre infrastructure for a London flagship store
ACCL worked with EM Tecnica to deliver approximately 1,500 Cat6 outlets and resilient OM4 and OS2 fibre infrastructure for UNIQLO’s London flagship store.
Warner Bros network infrastructure: resilient links across three London buildings
ACCL connected three Warner Bros London buildings using a 1 Gigabit CableFree laser link, microwave voice link and point-to-point Wi-Fi backup after permanent ISP circuits were delayed.
Live Network Migration & Comms Room Relocation for giffgaff’s Uxbridge Headquarters
ACCL relocated giffgaff’s comms room and recabled its 23,000 sq ft Uxbridge headquarters using a phased swing-space migration, keeping the live business fully operational throughout.
Structured Cabling, Wi-Fi, CCTV & Access Control Fit-Out for a Marine Technology Manufacturer
ACCL designed and installed a complete structured cabling, Wi-Fi, CCTV and access control solution for a marine technology manufacturer’s new 17,000 sq ft Portsmouth facility, delivered across a six-week Cat A to Cat B fit-out with zero safety incidents.