DHL East Midlands Airport
ACCL audited and expanded the network, including 50 km of OS2 fibre.
Structured Data Cabling
Structured data cabling for warehouses and distribution hubs across London, Surrey and Kent, phased into maintenance windows so scanners and WMS stay live.
ACCL audited and expanded the network, including 50 km of OS2 fibre.
Fibre and shielded copper are sized for seasonal surges.
Isolation and bypass links keep operations running.
There is room for new materials-handling equipment.
Recent distribution work: DHL East Midlands Airport (nearby)
Warehouse data cabling
ACCL installs the copper and fibre behind handheld scanners, pick systems, conveyor controllers, robots and CCTV in warehouses. Operators get a low-latency backbone that is built for peak season and sized with spare ports for the next piece of automation.
Cabling for the wider freight and intermodal chain.
Explore →Rugged, shielded cabling for noisy production sites.
Explore →Wireless coverage for racking, aisles and yards.
Explore →Redundant fibre rings between mezzanines and data cores.
Explore →Delivered on distribution sites
Cabling guide
Modern fulfilment centres process thousands of orders an hour, and every step runs over the network. Handheld RF scanners sync inventory live, pick-to-light displays direct operatives and autonomous mobile robots weave between aisles. Conveyor PLCs feed WMS dashboards, and HD CCTV tracks every pallet.
Lose a packet and the pick path hesitates, and delay an update and stock accuracy drops. Yet many warehouses still run Cat 5e installed when paper pick lists were the norm, with unshielded pairs beside 415 V conveyor motors, cracked jackets hanging from mezzanines and crowded wall boxes cooking the switches. ACCL’s warehouse-grade structured cabling systems give orders a low-latency backbone that keeps performance targets in reach.

Better cabling solves the faults that hit warehouses hardest at peak. The six most common are:
Long copper runs and motor interference cause scanner drop-outs and WMS delays at the worst moment, during peak.
Raised forks, pallet snags and cage trolleys rip unsupported drops and leave intermittent faults that drain engineer time.
Unheated bulk stores fall below freezing while mezzanine offices bake in summer, which stresses unprotected jackets.
Rapid scale-up fills racks, and unlabelled cords baffle technicians and slow repairs.
New PTZ cameras, LED beacons and RFID readers overload legacy Cat 5e pairs and force expensive power runs.
Without surplus fibre cores and copper ports, mobile robots and automated sorters face downtime while cabling is extended.
Fulfilment-ready cabling pairs shielded copper with armoured routes and redundant fibre. The main elements are:
Foil around each pair plus a braided screen rejects interference from conveyors and pallet wrappers and sustains 10 Gbps at 90 metres.
Redundant 40/100 Gbps rings link mezzanine switches to data cores for round-the-clock uptime.
Steel-tape armour resists impacts, and low-smoke jackets protect staff in an evacuation and meet insurer clauses.
High-level routing stays clear of forklifts, keeps lifting heights safe and reduces cable strikes.
Engineers can identify drops straight away, even in low-light aisles.
90 W support powers IP66 cameras, pick-by-voice headsets and smart-lighting nodes without extra electrical circuits.
Sealed cabinets with positive-pressure filtration protect switches from dust, fibre lint and changing temperatures.
A warehouse project follows six steps, from a peak-flow audit to a documented handover.
Logistics managers, IT teams and health-and-safety leads outline peak order volumes, expansion plans and restricted working windows.
Engineers scan racking heights, mezzanine voids and external yards outside shift hours, logging hazardous zones and lift routes.
Shielded Cat 6A, OS2 fibre and IP-rated hardware are specified to EN 50173-3, with spare ports for materials-handling equipment expansion.
Work lines up with maintenance downtime. Temporary bypass links keep WMS and CCTV live, and lock-out/tag-out and traffic management plans protect operatives.
Fluke DSX-8000 certifies every copper pair, OTDR sweeps validate the fibre, and live conveyor tests confirm immunity to interference.
Site teams receive digital-twin schematics, QR-tagged patch panels and a 25-year warranty.
Safety and quality are agreed before the first night shift. ACCL is ISO 9001, ISO 14001 and SafeContractor accredited, which covers quality, environmental management and health and safety on high-risk sites. The other safeguards are:
Cable routes avoid lifting-equipment exclusion zones, and teams follow equipment isolation procedures.
Explosion-risk bulk-storage areas receive intrinsically safe conduit and stainless glands as required.
Intumescent collars restore compartmentation at mezzanine penetrations, which supports insurer audits.
Scrap copper is recycled and plastic reels go back to the supplier, supporting ISO 14001 objectives.
Operations managers, IT managers and finance directors gain steadier picking, faster fixes and room for automation. The benefits are:
Stable scanner and WMS connectivity removes retries and manual re-scans.
Redundant fibre spines and shielded copper sustain Black Friday and pre-Christmas surges without bottlenecks.
Colour-coded, laser-etched labels and QR-tagged panels shorten the time spent finding a fault.
Spare ports and dark fibre cores support robot fleets, RFID portals and private 5G backhaul without re-cabling.
Cool, monitored racks reduce switch throttling and cooling load, which supports sustainability targets.
A 25-year warranty and rugged materials push refresh cycles further out and protect capital budgets.
ACCL has delivered warehouse and parcel-handling cabling where operations could not stop. Three examples show the range:
Before you book
Yes. Work is scheduled during maintenance windows, adjacent zones are isolated with mobile barriers and lock-out/tag-out, and temporary bypass links keep SCADA and scanners online.
Armoured Cat6A and IP67 fibre enclosures withstand weather and vehicle impacts, and heated enclosures protect switches in freezing conditions.
If runs exceed 90 metres or interference risk is high, fibre is essential. Designs balance capital cost against performance and future scalability.
Designs include spare ports and dark fibre, so adding a line means patching into pre-labelled drops with no extra cable pulls.
Yes. The 25-year system warranty stays valid for the new owner, which adds to the value of the asset.
A warehouse survey is free of charge and the itemised quote arrives before any work starts. A fixed-price proposal follows within 48 hours of receiving your warehouse floor plans. How long the work takes depends on the size of the site and maintenance windows and shift patterns, so the phasing is agreed with operations managers at survey.

The team behind your cabling project
Wayne Connors founded ACCL in 1997 and has led our commercial cabling projects ever since. We’re a member of the London Chamber of Commerce and Industry.
Free cabling site survey
One of our own engineers surveys your site at no cost and with no obligation.
Excellent · 60+ Google reviews · Founded 1997 · £10m liability cover
Expert Insights

When copper is still the right choice, when fibre is, and how to tell which your business needs.
Read guide
Network cabling mistakes are among the most frustrating problems to deal with.
Read guide
Network cabling performance headroom is the difference between a basic PASS result and long-term confidence.
Read guideBrowse practical guidance, industry updates and planning tools for commercial network infrastructure projects.
Active Communication Company Ltd trades as ACCL, ACCL Data Cabling London and ACCL Data Cabling Kent · Commercial data cabling and network infrastructure specialists