Office relocation cabling, planned around your new space.

An office move or refurbishment is the right time to redesign the network properly. ACCL plans and installs office relocation cabling around the new floor layout, expected headcount, applications, Wi-Fi coverage, cabinet locations and future growth.

We manage the cabling and infrastructure workstream from the first survey through installation, cutover, testing, labelling and documented handover, with the design grounded in practical office cabling requirements rather than a copy of the old layout.

  • Pre-move surveys covering routes, containment, comms room space, power, landlord constraints and retained infrastructure.
  • Structured cabling and fibre designed for the new floor plan, cabinet positions, resilience needs and performance requirements.
  • Comms room and cabinet work including cabinet installation, patching, tidy works and migration planning.
  • Testing, labelling and records so the client IT team receives usable documentation at handover.
Book a free site survey

A clear route from first survey to working network.

The programme is built backwards from your move or reopening date, with responsibilities, access windows, dependencies and handover requirements agreed before installation begins.

01 · Survey and scope
We review the premises, layout, access, containment, cabinet space, retained services and known project constraints.

02 · Network design
Outlet locations, fibre links, cabinets, Wi-Fi requirements and capacity are designed around the new environment.

03 · Programme and install
Work is coordinated with the fit-out team, landlord and client stakeholders, including out-of-hours delivery where required.

04 · Cutover and testing
Live services are migrated in the agreed order and each included link is tested before release to the client team.

05 · Handover
Labels, certification results and as-built information are issued so the network is supportable from day one.

The move date is fixed. The network plan has to work backwards from it.

A relocation project is not complete when the last cable is installed. It is complete when users can arrive, connect and work as expected on the agreed date.

ACCL coordinates with your internal IT team, fit-out contractor, landlord and other trades to confirm dependencies early. That includes cabinet readiness, power, carrier services, access windows, floor-box positions, desk layouts and the order in which live services need to move.

“The objective is a controlled handover, not a last-minute collection of separate cabling tasks.”

Wayne Connors, Founder and Managing Director, ACCL

A single point of contact for the wider relocation package.

The cabling package can be coordinated with the wider infrastructure needed at the new site, reducing gaps between trades and giving the project team one clear point of responsibility.

  • Office cablingView service
    Structured copper and fibre cabling for newly fitted and occupied commercial spaces.
  • IT moves, adds and changesView service
    Desk moves, patching changes and smaller migrations within an existing live network.
  • Wi-Fi surveys and installationView service
    Coverage and capacity planned around the new floor layout, construction and expected device density.
  • Data cabinet and comms room servicesView service
    New cabinet builds, migrations, tidy works, patching and documentation.

Documentation that supports the handover.

Testing and records are agreed as part of the project scope, not treated as an optional final task once the move is already underway.

  • Fluke certification against the specified cabling standard and agreed test limit.
  • Consistent outlet, patch-panel and cabinet labelling across the installation.
  • Test-result files and usable handover information for the client IT and facilities teams.
  • System warranty options on qualifying manufacturer-backed installations.

London, Kent, Surrey and the South East.

ACCL delivers office relocation and refurbishment cabling projects across commercial buildings, occupied workplaces, managed offices and new fit-out environments.

  • London office relocations and floor-by-floor moves.
  • Kent and South East headquarters, satellite offices and refurbishment programmes.
  • Single-site projects and coordinated multi-site rollouts.
  • Work planned around landlord rules, permits, access windows and out-of-hours restrictions.

Bring ACCL in before routes, desks and cabinet positions are locked down.

We can review the new premises, identify cabling, fibre, Wi-Fi and comms room requirements, and turn the move date into a workable infrastructure programme.

Book your free site survey or call us on 0333 900 0101.

Frequently Asked Questions – (FAQs)

What does an office relocation cabling service include?

That depends on the project scope, but it commonly includes survey work, structured cabling design, fibre links, cabinet and comms room works, installation, testing, labelling, cutover planning and handover documentation.

How far in advance should cabling be planned for an office move?

Planning should begin as soon as the new layout and target move date are known. Larger projects may need several months, particularly where new containment, a comms room, landlord approvals or carrier services are involved. For a broader planning view, see ACCL’s IT office relocation checklist.

Which cabling standards and test methods do you work to?

ACCL designs and tests office relocation cabling against the standards and limits agreed at scoping. That commonly means copper cabling to the relevant ISO/IEC or TIA category standard, and fibre links tested to the manufacturer’s and Fluke recommendations for the chosen optics. For an overview of how certification testing works in structured cabling, see the guidance from Fluke Networks on cabling certification.

Can ACCL work in an empty shell and alongside the fit-out contractor?

Yes. We can deliver first-fix and second-fix cabling within a wider fit-out programme, coordinate routes and access with other trades, and return for testing and final handover when the space is ready.

Can the work be completed outside normal business hours?

Yes. Evening, weekend and phased working can be planned where building access and the programme allow it. The agreed method should reflect operational risk and the sequence of the move.

Do you remove cabling from the old office?

Legacy cable removal and decommissioning can be included where required, subject to the lease, landlord requirements and an agreed scope for retained or abandoned infrastructure.

What information is supplied at handover?

The handover package can include certification results, labelling schedules and as-built information. The exact format is agreed during scoping so it is useful to the client, facilities team and any building-management stakeholders.

Plan the network before the move programme closes in.

Arrange a site survey early enough to design the cabling, cabinet and cutover workstream properly, before the fit-out programme becomes restrictive.