Office relocation cabling

Office relocation cabling in London, planned around your new space and your move date.

ACCL plans and installs the cabling for office moves and refurbishments around the new floor layout, headcount, Wi-Fi coverage, cabinet positions and future growth. One team runs the cabling workstream from the first survey through installation, cutover, testing, labelling and documented handover. Book a free site survey early, before routes and desk positions are locked down.

Office move cabling

What an office relocation cabling package covers.

An office move or refurbishment is the right time to design the network properly, not to copy the old layout.

Pre-move surveys

Routes, containment, comms room space, power, landlord constraints and the infrastructure you are keeping.

Copper and fibre for the new floor plan

Structured cabling and fibre designed around the floor plan, cabinet positions, resilience and performance needs.

Comms room and cabinet work

Cabinet installation, patching, tidy works and migration planning for the new comms room.

Testing, labels and records

Usable documentation for your IT team at handover, not a pile of loose files.

Moving or refurbishing?

Book a free site survey and we will turn your move date into a cabling programme.

Book a Free Site Survey

From survey to working network

How an office move cabling project runs.

The programme is built backwards from your move or reopening date. Responsibilities, access windows, dependencies and handover needs are agreed before installation begins.

  1. Survey and scope

    We review the premises, layout, access, containment, cabinet space, retained services and known constraints.

  2. Network design

    Outlets, fibre links, cabinets, Wi-Fi needs and capacity are designed around the new space.

  3. Programme and install

    Work is coordinated with the fit-out team, landlord and your stakeholders, out of hours where needed.

  4. Cutover and testing

    Live services move in the agreed order and each included link is tested before release.

  5. Handover

    Labels, certification results and as-built information, so the network is supportable from day one.

The move date is fixed

A network plan that works back from the move date.

A relocation is not complete when the last cable goes in. It is complete when people can arrive, connect and work on the agreed date.

We coordinate with your IT team, fit-out contractor, landlord and other trades to confirm dependencies early: cabinet readiness, power, carrier services, access windows, floor-box positions, desk layouts and the order in which live services move. That is how we completed WideOrbit’s office relocation in four days, and relocated the comms room at giffgaff’s Uxbridge headquarters while staff kept working.

  • A controlled handoverNot a last-minute collection of separate cabling tasks.
  • Trades coordinated earlyRoutes and access agreed with the fit-out team and landlord.
  • Live services in orderCutover sequenced so the business keeps working.

One point of contact

The wider relocation package, under one team.

The cabling can be coordinated with the other infrastructure the new site needs. That closes the gaps between trades and gives the project team one clear point of responsibility.

Documentation

Documentation that supports the handover.

Testing and records are agreed as part of the scope, not left as an optional task once the move is under way.

  • Fluke certificationAgainst the specified cabling standard and the agreed test limit.
  • Consistent labellingOutlets, patch panels and cabinets labelled the same way across the installation.
  • Usable recordsTest-result files and handover information for your IT and facilities teams.
  • Warranty optionsSystem warranty options on qualifying manufacturer-backed installations.

Office moves explained

Office relocation and refurbishment cabling, in depth.

Why an office move is the time to redesign the network

An office relocation is the best chance you will get to design the network properly. We plan the cabling around the new floor layout, expected headcount, applications, Wi-Fi coverage, cabinet locations and future growth, not around a copy of the old office.

The design is grounded in practical office cabling needs: enough outlets in the right places, fibre where the backbone needs it, cabinets with room to grow and records the IT team can use. For the wider service, see our office cabling page.

Office refurbishment and Cat B fit-out cabling

A refurbishment or Category B fit-out changes desks, meeting rooms and partitions, and the cabling has to follow. We can work in an empty shell alongside the fit-out contractor: first-fix cabling while ceilings and floors are open, second-fix once the space takes shape, then testing and handover when the space is ready.

Our office fit-out guide covers the wider programme.

What the pre-move survey looks at

The survey sets the scope. We check cable routes and containment, comms room space, power, landlord rules and permits, carrier services and any infrastructure you plan to keep. Retained cabling is assessed rather than assumed: if the old network’s condition is unknown, a network audit shows what can be reused and what needs replacing.

Coordinating with IT, landlords and other trades

Most relocation problems come from dependencies found too late. We confirm cabinet readiness, power, carrier dates, access windows, floor-box positions and desk layouts early, and agree the order in which live services move. The aim is a controlled handover on the agreed date, with one clear point of responsibility for the cabling workstream.

Network and comms room relocation

Moving the network itself, not just the outlets, needs a planned cutover. We migrate live services in the agreed order, often in phases or out of hours, so the business keeps working. For server rooms and larger comms rooms, our data centre relocation team plans the equipment move alongside the cabling.

Smaller moves within the same office

Not every move is a relocation. Desk moves, team reshuffles and patching changes inside a live network are handled by our IT moves, adds and changes service, with the same testing and labelling.

Cabling standards and certification testing

We design and test relocation cabling against the standards and limits agreed at scoping. That usually means copper cabling to the relevant ISO/IEC or TIA category standard, and fibre links tested to the manufacturer’s and Fluke recommendations for the chosen optics. For an overview of certification testing, see the guidance from Fluke Networks on cabling certification.

Where we work

We deliver office relocation and refurbishment cabling across London, Kent, Surrey and the South East: London relocations and floor-by-floor moves, headquarters and satellite offices, refurbishment programmes, and single-site or coordinated multi-site rollouts. Work is planned around landlord rules, permits, access windows and out-of-hours restrictions, in occupied workplaces, managed offices and new fit-outs.

What affects the cost of office relocation cabling

Cost depends on the number of outlets, how much new containment and fibre the space needs, comms room and cabinet work, how much existing cabling can be kept, working hours, access and the testing and records required. Removing old cabling from the previous office adds to the scope.

A floor plan, headcount and target move date make the first estimate more useful. Our IT office relocation checklist lists what to gather.

Before you book

Office relocation cabling FAQs

What does an office relocation cabling service include?

It depends on the scope, but it usually includes a pre-move survey, structured cabling design, fibre links, cabinet and comms room work, installation, testing, labelling, cutover planning and handover documentation. One ACCL team runs the cabling workstream from the first survey to the day users arrive, and coordinates with your IT team, fit-out contractor and landlord along the way.

How far in advance should cabling be planned for an office move?

Start as soon as the new layout and target move date are known. Larger projects may need several months, especially where new containment, a comms room, landlord approvals or carrier services are involved. Bringing us in before routes, desks and cabinet positions are fixed avoids costly changes later. Our IT office relocation checklist gives a broader planning view.

Can you install the cabling before we move in?

Yes. We can work in an empty shell alongside the fit-out contractor, installing first-fix cabling while ceilings and floors are open and second-fix once the space takes shape. We coordinate routes and access with the other trades, then return for testing and final handover when the space is ready, so the network works on the day you move in.

Can existing cabling be reused in the new office?

Sometimes. The pre-move survey checks what cabling and infrastructure is already in the building and whether it suits the new layout and performance needs. Cabling in good condition can be retained and tested; cabling that is damaged, undocumented or in the wrong places is usually better replaced. The design follows the new space, not a copy of the old one.

Can the work be done outside business hours?

Yes. Evening, weekend and phased working can be planned where building access and the programme allow it, including the cutover of live services around a move weekend. The method we agree reflects the operational risk and the order in which the move happens, so your team can keep working until the switch.

Do you remove cabling from the old office?

Yes, legacy cable removal and decommissioning can be included where required. It depends on the lease, the landlord’s requirements and an agreed scope for which infrastructure is retained and which is removed. Tell us early, because strip-out often has to be finished before the old lease ends and affects the programme.

Which cabling standards and test methods do you work to?

We design and test to the standards and limits agreed at scoping. That usually means copper cabling to the relevant ISO/IEC or TIA category standard, and fibre links tested to the manufacturer’s and Fluke recommendations for the chosen optics. Every included link is certified with Fluke test equipment before handover, and you receive the results.

What information is supplied at handover?

The handover package can include certification results, labelling schedules and as-built information. The exact format is agreed during scoping so it is useful to your IT team, facilities team and any building management stakeholders. Outlets, patch panels and cabinets are labelled consistently, so the network is supportable from day one.

How much does office relocation cabling cost?

It depends on outlet numbers, new containment and fibre, comms room and cabinet work, how much existing cabling can be kept, working hours, access and testing. We do not quote a fixed price without seeing the space. Book a free site survey and you will receive an itemised quote before any work starts, with no obligation.

Do you work outside London?

Yes. We deliver office relocation and refurbishment cabling across London, Kent, Surrey and the South East, from single-site moves to coordinated multi-site rollouts. Work is planned around landlord rules, permits, access windows and out-of-hours restrictions wherever the new office is.

Wayne Connors, Founder and Managing Director of ACCL
Wayne ConnorsFounder & Managing Director

The team behind your office move

Cabling engineers who work to your move date.

Founded in 1997, ACCL plans, installs and tests office cabling through one accountable team. Our engineers work across London, Kent, Surrey and the South East, in empty shells, live offices and fit-outs.

Wayne Connors founded ACCL in 1997 and has led our commercial cabling projects ever since, including Grant Thornton’s relocations at 30 Finsbury Square and WideOrbit’s four-day office move. We are a member of the London Chamber of Commerce and Industry.

Planning a move or refurbishment

Plan the network before the move programme closes in.

One of our own engineers surveys the new premises at no cost and with no obligation, early enough to design the cabling, cabinet and cutover work properly.

  1. Survey We review the new space, routes and constraints.
  2. Itemised quote Cabling, cabinets, testing and access, all priced.
  3. Install and hand over Tested, labelled and ready on move day.