What good preparation considers
Before the installation starts, ACCL considers the building, current systems, future device demand, cable routes, risers, containment, comms room capacity, Wi-Fi access point locations, PoE requirements, security systems and the practical constraints of working in a live environment.
That is why ACCL’s work is not simply about installing cable. It is about understanding how the building works and what pressure points are likely to appear later.
- Suitable cable category and system design
- Bend radius and electrical separation controlled
- Clean termination and compatible components
- Clear outlet, patch panel and schedule labelling
- Correct test configuration and result review
- Useful handover evidence for the IT team