RM Gold, London: structured cabling, electrical and AV infrastructure
Having found premises for its new London office, the Canadian based mining company RM Gold decided on a full refurbishment, to create a high-quality, high-tech environment commensurate with the head office of a leading natural resources business. Communications cabling was outside the remit of the main contractor engaged for the refit, so the company had to select an installer itself…..and who better for the Job than ACCL.
RM Gold, London: structured cabling, electrical and AV infrastructure
A competitive-tender cabling win that grew into a complete office fit-out: structured cabling, power, lighting and AV.
ACCL was appointed by RM Gold’s London head office after a competitive tender, installing a Nexans Category 6 structured cabling system across 79 outlets before RM Gold extended the contract to cover electrical and AV infrastructure too. The completed project delivered new power, lighting and audio-visual systems throughout the office, from reception through to the boardroom, on time and within budget. (For the record, ACCL didn’t need the haul truck pictured above, and the team left RM Gold’s office exactly as tidy as they found it.)
The result
What began as a structured cabling contract grew into a complete office fit-out. The finished project delivered:
- A Nexans Category 6 structured cabling system across 79 outlets
- Contract extended to cover electrical, lighting and AV after cabling success
- A Powerplan Electrak underfloor power system for the full office
- Prolojik PIR movement-switching lighting control throughout
- Ten 50-inch plasma screens across the boardroom, break-out area and feature wall
- Delivered on time, to plan and within budget
Services delivered
Overview
RM Gold, a mining company with a London head office, needed a structured cabling system it could rely on. The company’s project spokesperson drew up a formal statement of requirements and invited competitive quotes from three companies.
ACCL installed a Nexans Category 6 cabling system serving 79 RJ45 outlets, housed in floor boxes and floor grid outlet positions and fed from a single comms room via a raised floor void.
The challenge
RM Gold needed a cabling partner it could trust on both price and understanding of the brief, chosen through a genuine competitive process rather than a single quote. The company’s project spokesperson explains how ACCL was selected:
“We drew up a structured cabling statement of requirements and invited quotes from three companies. An associate had recommended ACCL, and I was immediately impressed with its competitive pricing and comprehensive understanding of our requirements.”RM Gold project spokesperson
Need one partner for cabling, power and AV?
ACCL won RM Gold’s cabling contract through competitive tender, then earned the electrical, lighting and AV work too. Talk to us about a similarly joined-up office fit-out.
From cabling into electrical and AV
ACCL completed the cabling project on time, to plan and within budget. RM Gold was impressed enough with ACCL’s responsiveness that, on discovering ACCL also carried out electrical installation, the company extended the contract there and then to cover its power and lighting work too.
ACCL installed a Powerplan Electrak underfloor power system to supply the office’s full power requirements, including air conditioning, kitchen area appliances and AV systems. The same contract covered lighting cabling, including a managed Prolojik PIR movement-switching system for the main office areas and individual switching for newly built offices.
Adding visual impact to the fit-out
Beyond the core installation, ACCL proposed changes to the lighting specification to create genuine visual impact. LED lighting was installed in the reception area and along the feature wall leading to the boardroom, separately controlled from switches at the main entrance.
To complete the project, ACCL also supplied AV cabling and hardware, a Sky TV feed, and ten 50-inch plasma screens across the boardroom, break-out area and feature wall.
Technologies used
ACCL’s role
This project grew well beyond its original cabling brief. ACCL’s scope covered:
- Winning a competitive tender against two other cabling contractors
- Installing a Nexans Category 6 structured cabling system across 79 outlets
- Running cabling from a single comms room via a raised floor void
- Installing a Powerplan Electrak underfloor power system
- Delivering lighting cabling with Prolojik PIR movement switching
- Proposing LED lighting upgrades for reception and the boardroom feature wall
- Supplying AV cabling, hardware and a Sky TV feed
- Installing ten 50-inch plasma screens across the office
Why the project matters
RM Gold shows how a single, well-executed cabling project can grow into a much wider fit-out. ACCL won the work through a competitive tender on cabling alone, then earned the electrical and lighting contract simply by being responsive and easy to work with once on site.
It also shows ACCL contributing beyond the brief: proposing LED lighting changes that gave the reception and boardroom genuine visual impact, rather than just installing what was originally specified.
Related guidance
Foreword by Wayne
“RM Gold started as a straightforward cabling job and became a full office fit-out, and that is exactly the kind of project I like talking about. We won the cabling work fair and square against two other companies on a competitive tender, then the client trusted us with electrical, lighting and AV once they saw how we worked. What I am proud of is that we did not just install what was on the drawing. We looked at the reception and the wall leading into the boardroom and suggested LED lighting changes that gave the space real visual impact, properly controlled from the entrance, not just functional lighting bolted on. Ten plasma screens, a Sky feed, Nexans Cat6 to 79 outlets, Powerplan Electrak underfloor power, Prolojik lighting control: that is a genuinely complete office fit-out, delivered on time and on budget.”Wayne Connors, Managing Director, ACCL
“I found ACCL very responsive and easy to work with. Nothing was too much trouble. So when I discovered that it carried out electrical installation too I had no hesitation in extending the contract to include our power and lighting work.”RM Gold project spokesperson
Frequently asked questions
What did ACCL deliver for RM Gold’s London head office?
ACCL installed a Nexans Category 6 structured cabling system across 79 outlets, then extended the contract to deliver electrical, lighting and AV infrastructure for the same office.
What cabling system did ACCL install?
ACCL installed a Nexans Category 6 cabling system, fed from a single comms room via a raised floor void to floor boxes and floor grid outlet positions.
How many outlets does the cabling system serve?
The structured cabling system serves 79 RJ45 outlets.
Why did RM Gold choose ACCL?
RM Gold invited competitive quotes from three companies for a structured cabling statement of requirements. ACCL was recommended by an associate and won the contract on competitive pricing and a clear understanding of the brief.
Did the project stay on budget?
Yes. ACCL completed the cabling project on time, to plan and within budget.
Why did RM Gold extend the contract to ACCL?
RM Gold found ACCL responsive and easy to work with during the cabling project, and extended the contract to include electrical, power and lighting work once it discovered ACCL also carried out electrical installation.
What electrical work did ACCL deliver?
ACCL installed a Powerplan Electrak underfloor power system supplying the office’s full power requirements, including air conditioning, kitchen area appliances and AV systems.
What lighting control system was installed?
ACCL installed a managed Prolojik PIR movement-switching system for the main office areas, with individual switching for newly built offices, plus LED lighting in reception and along the boardroom feature wall.
What AV equipment did ACCL install?
ACCL supplied AV cabling and hardware, a Sky TV feed, and ten 50-inch plasma screens across the boardroom, break-out area and feature wall.
Did ACCL suggest any improvements beyond the original brief?
Yes. ACCL proposed changes to the lighting specification to create visual impact, including LED lighting in reception and along the feature wall leading to the boardroom, separately controlled from the main entrance.
What kind of company is RM Gold?
RM Gold is a mining company with a London head office, where ACCL delivered the structured cabling, electrical and AV project described here.
Related case studies
Need cabling, electrical and AV delivered by one team?
Talk to the team that won RM Gold’s cabling contract by competitive tender, then delivered the full office fit-out: power, lighting and AV.
Book a free site survey 0333 900 0101