Power and runtime planning
Checks real power, apparent power and estimated battery autonomy.
Cost Calculators and Planning Tools
Size commercial UPS capacity using kW, kVA, runtime, battery and resilience allowances for business-critical IT and network equipment.
Checks real power, apparent power and estimated battery autonomy.
Compares capacity, N+1 and 2N planning allowances.
Provides an immediate planning estimate before technical design.
Built for IT rooms, network racks and business-critical systems.
Recent projects: University of Oxford Museums, Queen Elizabeth Olympic Park, TUI UK and Ireland
The calculator
Battery energy is a planning estimate. Final runtime must be confirmed against the selected manufacturer’s discharge curves.
Indicative planning output only. UPS selection must be verified against equipment inrush, manufacturer load curves, battery chemistry, temperature, redundancy, bypass arrangements and electrical design before procurement.
The calculator turns the connected equipment load into an indicative UPS requirement. It first converts watts into design kW using the selected operating headroom and future-growth allowance. It then checks peak or inrush demand, converts the result to kVA using the UPS output power factor, and applies the selected N, N+1 or 2N resilience arrangement.
The battery result estimates the usable energy needed for the requested runtime after allowing for inverter efficiency, usable battery capacity and ageing. This provides a consistent early planning figure for business IT rooms, communications cabinets and small data-centre environments. It is not a manufacturer runtime guarantee or an electrical design.
Include every device that must remain operational during a power interruption: servers, storage, network switches, firewalls, routers, controllers and any essential monitoring equipment. Avoid using equipment nameplate ratings without checking whether they represent typical demand, maximum input or a power-supply rating. Where possible, use measured peak load from the live installation and reconcile it against the equipment schedule.
Decide which systems genuinely require UPS protection. Cooling, printers, general sockets and non-critical equipment may need a different continuity strategy. If dual-corded equipment uses separate A and B supplies, the design must also consider the load transferred to either path following a failure.
Operating headroom prevents the UPS running continuously at its limit. Future growth covers planned equipment additions, while the peak allowance provides room for short-duration demand or inrush. They should be based on the project rather than increased repeatedly as a substitute for accurate load information.
N provides only the capacity needed for the design load. N+1 adds a module so the protected load can continue if one module is unavailable, subject to the selected UPS architecture. 2N uses two independent capacity paths. Resilience affects switchgear, bypass, distribution, maintenance and room design as well as the headline UPS rating.
Battery autonomy is not linear. Actual runtime depends on battery chemistry, discharge rate, temperature, age, charger design and the manufacturer’s discharge curves. The calculated kWh is useful for comparing requirements, but the final battery string or cabinet must be selected using approved manufacturer data at the proposed load.
Longer runtime is not always the most economical approach. A generator, orderly shutdown process or resilient service architecture may provide a better continuity outcome. Maintenance access, replacement intervals, ventilation, weight, floor loading and safe isolation must also be reviewed.
A site assessment should confirm the incoming supply, protective devices, cable routes, bypass arrangement, earthing, generator compatibility, available space and cooling. ACCL can coordinate the UPS requirement with data-centre infrastructure, server and network cabinets, structured cabling and monitoring.
Planning limitation: final selection must use verified equipment loads, manufacturer efficiency and runtime data, and a competent electrical design. The result should not be used to purchase or connect a UPS without those checks.
Related planning tools include the Rack Power and Cooling Calculator, Data Centre PUE Calculator and Network Switch Capacity Calculator.
Book a free ACCL site survey to verify load, runtime, resilience, distribution, cabinet space and cooling before equipment is specified.
Book Your Free Site SurveyExplore our other free calculators
Check cabinet electrical load, current, heat output, cooling allowance and remaining rack capacity together.
Open the rack power and cooling calculator →Compare total facility energy with IT equipment energy and model indicative efficiency, cost and emissions improvements.
Open the data centre PUE calculator →Compare current and proposed infrastructure demand to estimate annual energy, cost and location-based emissions reductions.
Open the business energy and carbon savings calculator →Estimate device demand, switching capacity, PoE headroom and the likely infrastructure required to power connected equipment.
Open the PoE budget calculator →Estimate access-switch quantities, usable ports, spare capacity, uplink demand and one-switch failure allowance.
Open the network switch capacity calculator →Cost, capacity, power and efficiency calculators in one place.
See all 12 calculators →★★★★★
Excellent60+ Google reviews“As the client I can only say thanks and its an amazing piece of work by all involved. Believe me that the work to coordinate this work around other issues was challenging but Wayne and ACCL were great.”TUI / Scott Ronan
Planning UPS protection
Before you book
No. It is an early planning rating. ACCL confirms the electrical design and selected manufacturer before procurement.
UPS equipment is constrained by real and apparent power. The selected unit must satisfy both limits.
No. Actual runtime depends on the chosen battery system, load, age and temperature.
N+1 adds one capacity module; 2N duplicates the required capacity. The appropriate topology depends on business risk and maintenance needs.

Why businesses choose ACCL
ACCL has designed and installed commercial cabling and network infrastructure since 1997, for businesses across London and the South East.
Wayne founded ACCL in 1997 and has led the delivery of commercial cabling and network infrastructure projects ever since.
Free site survey
Book a free ACCL site survey to verify load, runtime, resilience, distribution, cabinet space and cooling before equipment is specified.
Excellent · 60+ Google reviews · Founded 1997 · £10m liability cover
Guides for planning a project

How cabling supports the smart building experience.
Read guide
What smart buildings are and the business benefits.
Read guide
What drives the price of a commercial cabling project.
Read guideBrowse practical guidance, industry updates and planning tools for commercial network infrastructure projects.
Active Communication Company Ltd trades as ACCL, ACCL Data Cabling London and ACCL Data Cabling Kent · Commercial data cabling and network infrastructure specialists