Education · Heritage · Fibre
University of Oxford Museums network modernisation
Featured case studies
Education · Heritage · Fibre
University of Oxford Museums network modernisation
Wireless · Sport
Southampton FC Cisco Meraki Wi-Fi upgrade
Sports · Fibre optic
Wimbledon fire-survival fibre network
All case studies
55 projects-
Access Control · Cable ManagementForesight Group, The Shard: integrated office technology infrastructure
Integrated office technology infrastructure for Foresight Group’s 17,710 sq ft Level 23 workplace at The Shard, London.
View case study -
Cable Management · Data CablingGrant Thornton, 30 Finsbury Square: structured cabling across a decade of workplace transformation
Structured cabling support for Grant Thornton across three phases of workplace transformation at 30 Finsbury Square, London, spanning…
View case study -
Data Cabling · Fibre Optic CablingVerizon Business, London Hub: 358 Cat6A Outlets and Rooftop Private 5G
ACCL designed, installed and certified the structured cabling, fibre backbone and rooftop Private 5G infrastructure powering one of…
View case study -
Data Cabling · Tech and SaaSHP Design Centre, The Gherkin: 120 Cat6A Outlets for a Live Technology Showcase
Approximately 120 additional Cat6A outlets installed and the existing structured cabling reconfigured during a three-month live technology refresh…
View case study -
Access Control · CCTVUNIQLO Oxford Street: 1,500 Cat6 outlets and resilient fibre infrastructure for a London flagship store
1,500 Cat6 outlets with diversely routed OM4 and resilient OS2 fibre infrastructure delivered for UNIQLO’s London flagship store.
View case study -
Entertainment · Fibre Optic CablingWarner Bros network infrastructure: resilient links across three London buildings
A rapid, resilient three-building network using CableFree laser, microwave and point-to-point Wi-Fi technology when permanent ISP circuits were…
View case study -
Data Cabling · Medical and HealthCaring Dental, Petts Wood: shielded Cat6A structured cabling for a new dental practice
38 Excel shielded Cat6A outlets designed around the clinical rooms and specialist equipment at Caring Dental, Petts Wood.
View case study -
Cable Management · CCTVLive Network Migration & Comms Room Relocation for giffgaff’s Uxbridge Headquarters
ACCL relocated giffgaff’s comms room and recabled its 23,000 sq ft Uxbridge headquarters using a phased swing-space migration,…
View case study -
CCTV · Data CablingKent Enviropower, Allington: thermal imaging camera replacement and fibre upgrade
Replacing four end-of-life thermal imaging cameras and a new armoured fibre backbone for a safety-critical fire suppression system,…
View case study -
Access Control · CCTVCabot Financial, Kings Hill: Avigilon CCTV and access control
A unified Avigilon CCTV and access control platform across Cabot Financial’s Kings Hill campus in Kent, covering 43…
View case study -
Access Control · CCTVStructured Cabling, Wi-Fi, CCTV & Access Control Fit-Out for a Marine Technology Manufacturer
ACCL designed and installed a complete structured cabling, Wi-Fi, CCTV and access control solution for a marine technology…
View case study -
CCTV · Data CablingSkinners’ Hall, City of London: structured cabling and security infrastructure
How ACCL delivered resilient Cat6A and OM4 fibre cabling, a managed UniFi network and CCTV infrastructure across Skinners’…
View case study
