Education · Heritage · Fibre
University of Oxford Museums network modernisation
Featured case studies
Education · Heritage · Fibre
University of Oxford Museums network modernisation
Wireless · Sport
Southampton FC Cisco Meraki Wi-Fi upgrade
Sports · Fibre optic
Wimbledon fire-survival fibre network
Cable Management case studies
19 projects-
Cable Management · Data Cabling20 Water Street, Canary Wharf: 1,532 Cat6A outlets and a resilient dual-MER backbone for JLL’s Docklands office
1,532 Cat6A outlets and a resilient dual-MER backbone delivered for JLL’s Docklands office at 20 Water Street, Canary…
View case study -
Cable Management · CCTVCity of London Workplace: 539 Warranted Cat 6A Links and Two-Stage Wi-Fi Validation
539 warranted Cat 6A links with resilient containment and two-stage Wi-Fi validation, delivered for a City of London…
View case study -
Cable Management · Educational InstitutionsUniversity of Oxford Museums: Network Infrastructure Audit, Cabinet Consolidation & Fibre Upgrade
Network audit, cabinet consolidation, PoE preparation and fibre backbone modernisation across Oxford University museum sites.
View case study -
Access Control · Cable ManagementForesight Group, The Shard: integrated office technology infrastructure
Integrated office technology infrastructure for Foresight Group’s 17,710 sq ft Level 23 workplace at The Shard, London.
View case study -
Cable Management · Data CablingGrant Thornton, 30 Finsbury Square: structured cabling across a decade of workplace transformation
Structured cabling support for Grant Thornton across three phases of workplace transformation at 30 Finsbury Square, London, spanning…
View case study -
Cable Management · CCTVLive Network Migration & Comms Room Relocation for giffgaff’s Uxbridge Headquarters
ACCL relocated giffgaff’s comms room and recabled its 23,000 sq ft Uxbridge headquarters using a phased swing-space migration,…
View case study -
Cable Management · Data CablingZaiwalla & Co Solicitors, Holborn: communications room consolidation
How ACCL consolidated Zaiwalla & Co Solicitors’ live comms cabinet into a smaller 24U footprint over a single…
View case study -
Cable Management · CCTVL’Ecole des Petits: CCTV replacement and cabling renewal, Fulham
How ACCL replaced an end-of-life analogue CCTV system with a modern Hikvision NVR estate and renewed the cabling…
View case study -
Cable Management · Data CablingTidraw office relocation: Wi-Fi-first network, Old Street, London
ACCL delivered a Wi-Fi-first office network for Tidraw’s Old Street HQ in just ten days — Ekahau survey,…
View case study -
Cable Management · Data CablingChestertons and Chase Buchanan, London: 37-branch multi-site infrastructure programme
How ACCL grew from an emergency Knightsbridge call-out into the standing infrastructure partner for 87 Chestertons and Chase…
View case study -
Cable Management · Data CablingBring Energy, Queen Elizabeth Olympic Park: fibre network audit and expansion
From a single emergency fibre repair in 2022 to the sole approved network infrastructure supplier across 84+ buildings.
View case study -
Access Control · Cable ManagementGeoTab Inc., Reading: Cat B office technology fit-out
A routine Cat B technology fit-out for GeoTab’s new Reading office uncovered a flooded sub-floor beneath the raised…
View case study
