Fibre Optic Cabling
Sun Chemical, Orpington: fire-survival OS2 fibre network for site-wide fire suppression
ACCL designed and installed an external fire-survival OS2 fibre optic ring connecting eight fire suppression water cannons to the fire control centre at Sun Chemical’s Orpington plant.
Liberty International & Capital Shopping Centres: nationwide shopping-centre network infrastructure
ACCL supported Liberty International and Capital Shopping Centres across a major UK retail portfolio, maintaining structured cabling, fibre, security and centre communications infrastructure while helping develop the Tenant Active System.
DHL Aviation, Heathrow Airport: structured cabling for automated parcel handling
ACCL installed 260 Excel Cat6 outlets and approximately 3 km of fibre to support a new automated parcel conveyor system at DHL Aviation’s Building 559, Heathrow Airport.
DHL East Midlands Airport: fibre infrastructure and parcel handling upgrade
ACCL supported DHL’s East Midlands Airport distribution hub expansion with network auditing, infrastructure consolidation, 50 km of OS2 fibre and connectivity for 10 parcel handling tracks.
20 Water Street, Canary Wharf: 1,532 Cat6A outlets and a resilient dual-MER backbone for JLL’s Docklands office
ACCL delivered approximately 1,532 Cat6A outlets and a resilient dual-MER OM4 and copper backbone for JLL’s relocated Docklands office at 20 Water Street, Wood Wharf.
Mitsubishi UFJ, 24 Lombard Street: a 62-position trading floor and 28 years of network infrastructure
ACCL delivered a new 62-position trading floor for a long-standing City of London banking client, with around 300 home-run Leviton Cat6a outlets and a diversely routed 24-core OM4 fibre backbone.
Edible Oils, Erith: structured cabling and high-bay Wi-Fi for four new production lines
ACCL upgraded the network infrastructure at the Edible Oils Erith site to support four new production lines, installing Cat6a cabling, diversely routed OM4 fibre and 32 Aruba Wi-Fi access points around live production.
University of Oxford Museums: Network Infrastructure Audit, Cabinet Consolidation & Fibre Upgrade
ACCL audited and rationalised network infrastructure across four Oxford University museums and the Botanic Garden, consolidating cabinets and modernising legacy fibre.
Wimbledon: 3km fire survival fibre optic network linking 13 stations across the estate
ACCL was appointed by Trinity Fire & Security to replace Wimbledon’s existing 2006 fibre infrastructure with a new 3km 8-core OM4 fire survival fibre optic network linking 13 stations across the estate.
Jimmy Choo, Victoria: Cat6 structured cabling and OM4 fibre for a 26,000 sq ft London headquarters
ACCL worked with EM Tecnica to design and build the Cat6 structured cabling and OM4 fibre backbone for Jimmy Choo’s approximately 26,000 sq ft Cat B headquarters in Victoria, London.
University Hospital Coventry: structured cabling for a campus-wide access control upgrade
ACCL delivered the structured cabling infrastructure supporting an access control upgrade across nine buildings at University Hospital Coventry, including 600+ data outlets, 16 communications rooms and approximately 10km of OS2 fibre.
Grant Thornton, 30 Finsbury Square: structured cabling across a decade of workplace transformation
ACCL supported Grant Thornton through three phases of workplace transformation at 30 Finsbury Square over almost a decade: relocation, refurbishment and headquarters consolidation.
