Education · Heritage · Fibre
University of Oxford Museums network modernisation
Featured case studies
Education · Heritage · Fibre
University of Oxford Museums network modernisation
Wireless · Sport
Southampton FC Cisco Meraki Wi-Fi upgrade
Sports · Fibre optic
Wimbledon fire-survival fibre network
Wireless case studies
22 projects-
CCTV · Data CablingSkinners’ Hall, City of London: structured cabling and security infrastructure
How ACCL delivered resilient Cat6A and OM4 fibre cabling, a managed UniFi network and CCTV infrastructure across Skinners’…
View case study -
Access Control · CCTVRoyal Russell School, Croydon: new junior school ICT and security infrastructure
How ACCL, Royal Russell School’s ICT partner of 15 years, delivered fibre, Cat6A B2CA cabling, CCTV, access control…
View case study -
Creatives · Data CablingLegal 500, Fleet Street: fibre backbone renewal and Wi-Fi 7 upgrade
A Wi-Fi survey at 188 Fleet Street uncovered a fibre backbone that could not carry the client’s planned…
View case study -
Data Cabling · Finance and TradingGard (UK) Limited, London: Wi-Fi-first infrastructure upgrade
ACCL installed 22 Excel Cat6A links to 11 Wi-Fi access point locations for Gard (UK) Limited at The…
View case study -
Cable Management · Data CablingChestertons and Chase Buchanan, London: 37-branch multi-site infrastructure programme
How ACCL grew from an emergency Knightsbridge call-out into the standing infrastructure partner for 37 Chestertons and Chase…
View case study -
Cable Management · Data CablingTidraw office relocation: Wi-Fi-first network, Old Street, London
ACCL delivered a Wi-Fi-first office network for Tidraw’s Old Street HQ in just ten days — Ekahau survey,…
View case study -
Access Control · Cable ManagementGeoTab Inc., Reading: Cat B office technology fit-out
A routine Cat B technology fit-out for GeoTab’s new Reading office uncovered a flooded sub-floor beneath the raised…
View case study -
CCTV · Data CablingThe Winter Club, Canary Wharf: network, Wi-Fi and CCTV infrastructure
Permanent-grade technology infrastructure for a fast-track seasonal hospitality and entertainment venue.
View case study -
Access Control · CCTVThe Observer Building, Hastings: fibre, Wi-Fi and security infrastructure
ACCL delivered the integrated communications and security infrastructure behind the restoration of one of Hastings’ most recognisable heritage…
View case study -
Access Control · CCTVSouthampton FC: St Mary’s Stadium and Staplewood network infrastructure
Long-term fibre, structured cabling and wireless infrastructure supporting stadium operations and elite football performance.
View case study
